 |
Position with the hot adhesive rolls |
 |
 |
|
Stage 1
|
|
 All elements necessary to the installation. |
| | The ground must be clean before and after use |
|
|
 |
|
 Application of the adhesive rolls |
| | Cut the roll to the exact dimensions plus 5cm before application.
Unroll on area. |
|
|
|
Stage 2
|
|
 Apply the roll of adhesive by heating with caution. |
| |
|
 |
|
 Heat until complete adhesion obtained |
| |
|
|
To obtain perfect adhesion heat the bituminous product completely. |
|
Stage 3
|
|
 Apply Road Carpet |
| |
|
 |
|
 Carry out final positioning |
| |
|
|
Stage 4
|
| Position the bands in together,
to obtain a perfect alignment. |
|
|
 |
| Reduce the joints and to fill them with hot adhesive from to obtain a good seal. |
|
|
 |
|
|
Stage 5
|
| Finish details and various cuttings |
|
|
 |
|
|