 |
Application with hot glue from CC |
 |
 |
|
Stage 1
|
| The ground must be clean before and after use |
|
|
 |
| To unroll the band and to position it |
|
|
|
Stage 2
|
|
|
Stage 3
|
|
Cut the ends square for alignment |
|
Stage 4
|
|
Roll up the band and cut. |
|
Stage 5
|
|
Roll the band in the hot adhesive.
Thickness of the adhesive : 2 to 3 mm maximum. |
|
Stage 6
|
| To position the bands in together, to obtain a perfect alignment. |
|
|
 |
| To reduce the joints and to fill them with hot adhesive from to obtain a good seal |
|
|
|
Stage 7
|
| Finish details and various cuttings |
|
|
 |
|
|
Precautions to be taken for ramps
|
| The application must be made from the bottom to the top of the slope. |
|
|
 |
|
|